Nashville Airport Dredging Case Study

Project Sponsor: Metropolitan Nashville Airport Authority

Application: Clean and dredge waste water treatment plant for airport runoff (from runway tarmac)

Dredge Used: LWT RCLPE Runt Dredge (Remote Control Lagoon Pumper Electric)

Project Summary: Automated remote control dredge with rail system to cover the entire pond without an operator and Bottom Sense™ (automated system to detect and protect lagoon bottom) to protect the plastic liner of the pond.

Source: Pollution Equipment News